What we do.

We develop creative, comprehensive, and sustainable engineering solutions for a future where society can thrive.

OUR SERVICES

SERVICES AND PRODUCTS

Cetec Engineering Ltd also refer to as Cetec Group has been privileged to work extensively within Lagos State and Ogun State, while also undertaking several projects in other locations such as Plateau State, Oyo State, FCT Abuja, Rivers State, Kebbi State, Ebonyi State, and Abia State.

We have been involved in numerous projects within the FMCG manufacturing segment and process improvement sector. Over the years, we’ve had the honor of working with reputable companies including PZ Cussons, Unilever Nigeria Limited, UAC Nigeria Limited, FrieslandCampina WAMCO, Procter & Gamble, and Reckitt Benckiser Limited.

Our scope of work has included the construction of new factory buildings, upgrades of existing facilities (MEP services design), utilities upgrades (especially power systems), and firefighting systems such as hydrants and sprinklers.

Call Center

Call us for more information or business inquiry.

+234 803 742 7052
+234 909 436 2539

Among our completed and ongoing projects:

Our portfolio features a range of completed and ongoing projects across various sectors and locations, showcasing our expertise in engineering design, infrastructure upgrades, and systems integration.

Agbara Mega Distribution Center for Unilever Nigeria PLC (2012)

Design of mechanical services, fire detection and firefighting systems including hydrants, sprinklers, and in-rack sprinkler systems. Waste management systems (solid and wastewater) connected to central sewage treatment, along with stormwater drainage and channeling.

Budget: Over ₦1.5 billion.

Villa Park Hotels, Abuja (2012 – Ongoing)

Construction of a 96-room, 5-star hotel.

Project Cost: Over ₦6 billion.

33kV Substation for Procter & Gamble Nigeria Ltd (2013)

Design of a 5MVA, 33kV substation at their Ibadan head office/factory. This project enabled the plant’s connection to the public grid.

Budget: ₦900 million.

Villa Park Hotels, Lagos (2013–2014)

New block extension and event hall (tent) construction.

Project Estimate: ₦200 million.

Unilever Agbara Soap Factory Upgrade (2014)

Design of MEP services for the facility.

Budget: Over ₦100 million.
Duration: 6 months.

Unilever Spreads Factory, Agbara (2015)

Design of MEP services for factory operations.

Budget: Over ₦200 million.
Duration: 1 year.

Unilever Agbara Savoury Factory Expansion (2016):

Design of MEP services for the facility.

Budget: About ₦350 million.

Fire Hydrant System & LPG Fire Protection for Reckitt Benckiser, Agbara (2017)

Design-only services.

Budget Estimate: ₦460 million.

Unilever Agbara Factory Firefighting System Upgrade (2018):

Design of hydrants and sprinklers covering the entire Unilever Agbara Industrial Estate.

Budget: Over ₦820 million.
Duration: 2 years.

Power System Upgrade (HV) for UAC Foods Nigeria Ltd at SWAN Factory, Kerang, Jos, Plateau State (2021)

Design of a power system to accommodate production line expansion.

Budget: Over ₦800 million.
Duration: 12 months.

Unilever Agbara Effluent Treatment Plant (2022)

Design project (equipment cost not included).

Budget: Over ₦200 million.
Duration: 1 year.

Unilever Ghana – Tema Null Firefighting System (2023 – Ongoing)

Design of a fire hydrant system for the Tema facility in Ghana.

Budget Estimate: Over $2 million.
(Implementation pending.)

Luxury Residential Villa, Amaigbo, Imo State (2024 – Ongoing)

Design and construction of a high-end residence.

Project Cost: Over ₦250 million.

Westside Beach Resort Hotels, Okun Ajah (2024 – Ongoing)

Development of a 50-bedroom luxury hotel.

Project Cost: Over ₦600 million.

Explore our services and see how we turn your ideas to reality

Architecture

Transform your vision into reality with our comprehensive architectural services. From concept to completion, we ensure meticulous attention to detail and quality. Let us bring your project to life.

Project Management

Achieve project success with our expert management services. We handle schedules, budgets, and resources to deliver on time and within budget. Experience seamless project execution.

MEPF Engineering

Optimize your building’s functionality with our high-performance MEPF (Mechanical, Electrical, Plumbing and Fire) engineering solutions. We integrate cutting-edge technologies for efficient, comfortable environments.

Civil & Structural Engineering

Ensure safety and longevity with our robust structural engineering solutions. We design and supervise to uphold the highest standards of integrity and durability.

Green Building & LEED Consultants

Commit to sustainability with our green building expertise. Achieve LEED (Leadership in Energy and Environmental Design) certification and minimize environmental impact with our eco-friendly design strategies.

Oil & Gas

Maximise efficiency and safety in your oil and gas projects with our comprehensive engineering solutions. We cover well design, drilling, pipeline, and more.

Construction Engineering & Management

Deliver safe, efficient, and sustainable infrastructure projects with our comprehensive construction engineering and management services. From planning to operations, we've got you covered.

Building Information Management (BIM)

Enhance your construction projects with our cutting-edge BIM services. Create detailed 3D models, resolve design conflicts, and optimize planning for improved efficiency.

Company From All Around The World trust Cetec Enginnering for awesome project

0 +

Project Realize

0 +

Expertise

0 +

staff members nationwide

0 +

Awards Won

Need Help?

Don’t hesitate to contact us for more information about company or service

Get our News Update

Sign up our newsletter to get update news and article about company.

Agbara Mega Distribution Center for Unilever Nigeria PLC (2012):

Villa Park Hotels, Abuja (2012 – Ongoing)

Unilever Agbara Savoury Factory Expansion (2016)

Unilever Agbara Factory Firefighting System Upgrade (2018)